检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张丽华 贾丙存 杜梦飞 ZHANG Lihua;JIA Bingcun;DU Mengfei(Water Resources Engineering Corporation of Linyi Municipality,Shandong Province,Linyi,Shandong 276000,China)
机构地区:[1]山东临沂水利工程总公司,山东临沂276000
出 处:《山东水利》2022年第3期34-35,38,共3页Shandong Water Resources
摘 要:文章以临沂市兰山区祊河华夏水源工程橡胶坝施工为实例,介绍了一种新型橡胶坝坝袋预埋件加固方式的施工工艺及效果。“担架式扣件”能有效解决施工步骤繁琐、加固不牢靠、影响施工工期的问题,是对常规预埋件加固施工方法的改进。Taking the construction of rubber dam of Huaxia Water Source Project in Beng River,Lanshan District,Linyi Municipality as an example,this article introduces the strengthening construction technology and effect of embedded parts of a new type of rubber dam bag."Stretcher type fastener",as an improvement of strengthening construction method to the conventional embedded parts,can solve the problems effectively,such as complicated construction steps,unstable strengthening,affecting the construction period and so on.
分 类 号:TV644[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.7.73