检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:路美丽 Lu Meili(China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Beijing 102600,China)
机构地区:[1]中铁第五勘察设计院集团有限公司,北京市102600
出 处:《北方交通》2022年第5期71-74,共4页Northern Communications
基 金:中铁第五勘察设计院集团有限公司科研课题(T5Y2019-C05)。
摘 要:近年来随着高铁建设的快速发展和环保要求的提高,隧道洞口“零开挖”理念越来越受到人们的重视。结合安九高铁隧道具体工程地质条件和地形条件,采用“零开挖”进洞方法对原设计方案进行了优化。通过适当延长暗洞长度及调整管棚护拱长度,大幅降低了边仰坡开挖高度和挖方量及洞口占地,达到了“零开挖”仰坡进洞、稳定仰坡、保护生态环境的目的。In recent years,with the rapid development of high-speed railway construction and the improvement of environmental protection requirements,the concept of"Zero Excavation"at the tunnel portal has attracted more and more attention.In combination with the specific engineering geological conditions and topographic conditions of Anqing-Jiujiang high-speed railway tunnel,the original design scheme is optimized by using the tunnel entry mode of"Zero Excavation".The excavation height and excavation volume of the side and front slope and the area occupied by the portal are greatly reduced by appropriately extending the length of the concealed tunnel and adjusting the length of the pipe shed guard arch,so as to achieve the aim of front slope tunnel entry of"Zero Excavation",stabilize the front slope and protect the ecological environment.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.34.100