检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘旭光 Liu Xuguang(Liaoning Highway Surveying and Designing Company,Shenyang 110006,China)
出 处:《北方交通》2022年第5期91-94,共4页Northern Communications
摘 要:在国务院机构改革、职能改革的背景下,公路工程建设程序发生较大调整。在查阅国家级、省级以及相关行业相关政策、法规文件的基础上,整理出辽宁省普通国省干线公路在工可研和勘察设计两阶段的基本建设程序,供相关项目管理部门、建设单位参考。Under the background of the institutional reform and functional reform of the State Council,the procedure of highway engineering construction has been greatly adjusted.On the basis of consulting the relevant policies,documents of laws and regulations of national,provincial and relevant industries,the capital construction procedures of ordinary national and provincial trunk highways in Liaoning province in the two stages of engineering feasibility study and survey and design are sort out,so as to provide reference for relevant project management departments and construction units.
关 键 词:机构改革 普通国省干线公路 建设程序 工可研阶段 勘察设计阶段
分 类 号:U412[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170