检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李海卓 LI Hai-zhuo(HBIS Group Tangsteel Medium and Heavy Steel Plate Co.,Ltd.,Tangshan 063009,China)
机构地区:[1]河钢集团唐钢中厚板材有限公司,河北唐山063009
出 处:《机械工程与自动化》2022年第3期207-208,共2页Mechanical Engineering & Automation
摘 要:在对唐钢中厚板精整车间产线优化研究的基础上,提出在滚切式双边剪磁力对中装置前增设预对中装置。预对中装置的核心部件是打正小车与抬升梁,通过抬升梁将钢板抬起,由打正小车完成钢板校正的动作,缩短滚切式双边剪磁力对中装置对中钢板时间,提升剪切速度及产线产能。Based on the study of production line optimization in medium and heavy plate finishing workshop of Tang Steel,a new pre-centering device was proposed before the roller cutting bilateral shear magnetic alignment device.The core components of the alignment device are propelling trolley and the lifting beam.The lifting beam lifts the steel plate,and the propelling trolley completes the action of the steel plate effect,shortens the time of the steel plate of the bilateral shear magnetic centering device,and improves the shear rate and the production line capacity.
分 类 号:TG333.21[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63