检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:聂建永 Nie Jianyong(Shanxi Lyuliang Lishi Xishan Yachen Coal Co.,Ltd.,Lyuliang Shanxi 033000)
机构地区:[1]山西吕梁离石西山亚辰煤业有限公司,山西吕梁033000
出 处:《机械管理开发》2022年第3期161-162,165,共3页Mechanical Management and Development
摘 要:为解决随着工作面的推进和相邻工作面回收封闭导致通风量不足的问题,以某煤矿1017工作面为例,在研究其地质、瓦斯以及通风等基本情况的基础上,通过新增回风立井、新匹配通风机并扩大回风巷道断面面积等对通风系统进行改造。应用结果表明,经改造后,工作面的通风能力、负压能满足实际生产的需求。In order to solve the problem of insufficient ventilation due to the advancement of the working face and the recovery and closure of the adjacent working face,the ventilation system was modified by adding a new return air shaft,matching new ventilation fans and expanding the roadway cross-sectional area based on the study of the basic conditions of geology,gas and ventilation of the 1017 working face.After the renovation,the ventilation capacity and negative pressure of the working face meet the actual production requirements.
关 键 词:通风系统 负压 通风量 扩大巷道断面面积 需风量
分 类 号:TD724[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15