煤矿变压器带负载开关存在问题和处理方法研究  被引量:1

Research on Bottlenecks and Handling Methods Based on Coal Mine Transformers with Load Switching

在线阅读下载全文

作  者:刘凯 Liu Kai(Chengzhuang Mine Work of Jinneng Holding Coal Group,Jincheng Shanxi 048000)

机构地区:[1]晋能控股煤业集团成庄矿,山西晋城048000

出  处:《机械管理开发》2022年第5期338-339,共2页Mechanical Management and Development

摘  要:基于变压器带负载开关在长期运行过程中,会受到设备老化、检修以及自身运行过程中的电压过高、负载电荷恶化等运行条件的影响,容易引发事故或造成隐患这一问题,对其开关进行探索和研究,根据变电站中变压器带负载开关出现的瓶颈进行分析和讨论,并且提出对应的处理方法,从而提升带负载变压器的安全使用性。Based on the problem that the transformer with load in the long-term operation process will be affected by the aging of equipment, overhaul and the operating conditions such as high voltage and deterioration of load charge during its own operation, which will easily cause accidents or hidden dangers, the switch is explored and studied, and the bottlenecks that appear in the switch with load in the substation are analyzed and discussed, and the corresponding processing methods are proposed, so as to enhance the The analysis and discussion are based on the bottlenecks of load switches in substations.

关 键 词:煤矿 变压器带负载开关 电力系统 

分 类 号:TD605[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象