检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔炫[1] 胡强 CUI Xuan;HU Qiang(Guizhou Transportation Planning Survey&Design Academe Co.,Ltd.,Guiyang,Guizhou 550008,China)
机构地区:[1]贵州省交通规划勘察设计研究院股份有限公司,贵州贵阳550008
出 处:《中国岩溶》2022年第1期34-46,共13页Carsologica Sinica
摘 要:卡罗Ⅱ号隧道为贵州省平塘至罗甸高速公路控制工程,施工时揭示溶洞发育于右幅隧道的拱底部位,左右线隧道中部岩柱薄易于坍塌,特提出洞渣回填以及桥梁跨越两种处置手段并在技术及经济方面进行比选,综合确定洞渣回填为该溶洞处理方式。为验证回填方案的合理性,以有限元软件MidasGTS建立溶洞回填前后隧道开挖施工模型,分析出溶洞处理前后围岩位移、锚杆轴力以及围岩塑性区变化规律,同时监测典型断面的累计拱顶沉降、收敛变形情况,结果表明:溶洞回填后,围岩位移、锚杆轴力峰值有较大降低,中部岩柱以及下部溶腔塑性区发展由于回填得以控制,溶洞回填可有效抑制围岩变形,施工期间也并未出现突泥、涌水灾害事故,其回填方案有较高的可行性。Karst landform has brought great hidden dangers to the construction and operation of transportation in⁃frastructure.In order to eliminate the risk of covered karst to tunnel construction and operation,two methods of tunnel slag backfilling and bridge crossing have been proposed for the treatment of covered karst cave exposed dur⁃ing construction in the engineering background of Pingluo Tunnel II of Pingtang-Luodian Expressway in Guizhou Province.After the comprehensive comparison of the two methods in terms of technology and economy,tunnel slag backfilling is decided as the optimal treatment method of the karst cave.To verify its rationality,a three-di⁃mensional model under two conditions before and after treatment of karst cave was established by using finite ele⁃ment software Midas GTS.The treatment effect of backfilling of karst cave quantitatively was evaluated from four perspectives:displacement of surrounding rock,internal force of support structure,distribution characteristics of plastic zone of surrounding rock and its equivalent stress.The results show that the displacement peak value of sur⁃rounding rock decreased by 32.6%from-4.671 mm before the treatment to-3.148 mm after the treatment.Fur⁃thermore,after karst cave treatment,the peak value of settlement of left tunnel arch and of right tunnel arch re⁃spectively decreased 0.567 mm(by 15.6%)and 0.503 mm(by 21%).Before and after the treatment,anchors in tunnel system were mainly tensioned,and few of them were under pressure.System anchors could effectively play their suspension role.The stress data of system anchor show that the peak value of system anchor force decreased by 32.6%from 35.37 kN to 32.48 kN after the backfilling of karst cave.Distribution characteristics of plastic zone of surrounding rocks are able to reflect the scope of loosening and destruction of surrounding rocks.Before the karst tunnel was filled and treated,excavation of the right tunnel had caused great disturbance to surrounding rocks below the arch shoulder of the
关 键 词:公路隧道 小净距 数值计算 溶洞回填 桥梁跨越 优化分析 结构响应规律
分 类 号:U455.49[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28