检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马景超 何文龙 MA Jingchao;HE Wenlong(Comprehensive Improvement Service Center of Land and Resources Bureau of Heze,Heze Shandong274000;Yellow River Information Center,Jinan Shandong 250013)
机构地区:[1]菏泽市国土综合整治服务中心,山东菏泽274000 [2]山东黄河信息中心,山东济南250013
出 处:《山东农业工程学院学报》2022年第5期36-39,共4页The Journal of Shandong Agriculture and Engineering University
摘 要:针对黄河滩区淤筑村台含水量高、承载力低、稳定性差等问题进行了分析,提出台体沉降固结处理的办法。实践表明“井点降水法”加“强夯法”加快了台体沉降固结速度,节省了工程时间和资金,保证了整个工程的按期完成。这一研究成果为黄河滩区淤筑村台沉降固结施工提供依据,对以后的淤筑村台沉降有示范作用,也为类似工程建设提供经验参考并具有一定的借鉴意义。In order to accelerate consolidation settlements for silting up village platforms and guarantee the start of the community construction project as scheduled,“Well-point dewatering”and“dynamic consolidation”fundamentally resolved some issues and problems,including slow water sedimentation,uneven sedimentation and soil liquidation,thereby saving funds and duration of construction.Moreover,well-point dewatering and dynamic consolidation are creatively utilized in consolidation settlements in beach areas of the Yellow River,This outcome of research has demonstration effects on silted-up village platforms based upon consolidation settlements,aiming to provide technical support for the ecological protection of the Yellow River basin and the strategy of high-quality development.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28