A Pull-Out Test Study on the Working State of Fully Grouted Bolts  被引量:1

在线阅读下载全文

作  者:Ruixin Zhao Zhongju Feng Guan Jiang Fuchun Wang Yidong Zhang Changan Zhang Zhenbing Wang 

机构地区:[1]School of Highway,Chang’an University,Xi’an,710064,China [2]Shandong Hi-speed Group Co.,Ltd.,Jinan,250098,China [3]Shandong Provincial Communications Planning and Design Co.,Ltd.,Jinan,250031,China

出  处:《Fluid Dynamics & Materials Processing》2021年第2期441-453,共13页流体力学与材料加工(英文)

基  金:The National Key Research and Development Project(2018YFC1504801);the National Nature Science Foundation of China(41272285);the Transportation Technology Key Project of Shandong Province(JHLYDKY2).

摘  要:The present study examines the working conditions of fully grouted bolts used for the construction and expansion of high slopes.On the basis of a pull out destructive test,the work load and the ultimate load are obtained on site,and the Flac3d numerical simulation method is employed to determine the axial force distribution and the effective anchor length.The test results show that(1)the Q-S(load-displacement)curve of the bolt displays a certain degree of deformation coupled with the creep of the surrounding rock;(2)the working load of the bolt is closely related to the sliding deformation trend of the slope,while the ultimate load depends on the design parameters of the bolt and the lithology of the slope;(3)the distribution of bolt axial force is characterized by a single peak along the bolt length and the effective anchorage length of the bolt is 3 m;(4)after 20 years,the bolt’s ultimate load has a maximum loss of 31.94%.

关 键 词:Geotechnical engineering highway slope full length grouted anchor destructive test stress loss 

分 类 号:TD3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象