检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ruixin Zhao Zhongju Feng Guan Jiang Fuchun Wang Yidong Zhang Changan Zhang Zhenbing Wang
机构地区:[1]School of Highway,Chang’an University,Xi’an,710064,China [2]Shandong Hi-speed Group Co.,Ltd.,Jinan,250098,China [3]Shandong Provincial Communications Planning and Design Co.,Ltd.,Jinan,250031,China
出 处:《Fluid Dynamics & Materials Processing》2021年第2期441-453,共13页流体力学与材料加工(英文)
基 金:The National Key Research and Development Project(2018YFC1504801);the National Nature Science Foundation of China(41272285);the Transportation Technology Key Project of Shandong Province(JHLYDKY2).
摘 要:The present study examines the working conditions of fully grouted bolts used for the construction and expansion of high slopes.On the basis of a pull out destructive test,the work load and the ultimate load are obtained on site,and the Flac3d numerical simulation method is employed to determine the axial force distribution and the effective anchor length.The test results show that(1)the Q-S(load-displacement)curve of the bolt displays a certain degree of deformation coupled with the creep of the surrounding rock;(2)the working load of the bolt is closely related to the sliding deformation trend of the slope,while the ultimate load depends on the design parameters of the bolt and the lithology of the slope;(3)the distribution of bolt axial force is characterized by a single peak along the bolt length and the effective anchorage length of the bolt is 3 m;(4)after 20 years,the bolt’s ultimate load has a maximum loss of 31.94%.
关 键 词:Geotechnical engineering highway slope full length grouted anchor destructive test stress loss
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.70.76