检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何东 HE Dong(Wuxi Metro Operation Co.,Ltd.,Wuxi 214174,China)
出 处:《通信电源技术》2022年第1期116-118,共3页Telecom Power Technology
摘 要:为解决无锡地铁2号线列车偶发的网络瘫痪问题,通过问题提出、问题分析以及解决方法3个步骤深入调查分析故障现象,查找网络瘫痪的具体原因。通过多种工况的复现,发现当网络通信总线断开时,网络通信判定方式导致网络冗余无效,最终反馈网络瘫痪故障。对此,描述网络瘫痪故障现象,分析网络系统架构,解释当前方案中的网络通信机理及故障发生原因,提出了一种利用帧数的优化解决方案。优化后的方案目前已经实现了现车应用,可解决发生的网络瘫痪故障。In order to solve the occasional network breakdown of Wuxi Metro Line 2 train,this paper makes an in-depth investigation and analysis of the fault phenomenon through three steps of problem raising,problem analysis and solution,and finds the specific reasons for the network breakdown.Through the reoccurrence of various working conditions,it is found that when the network communication bus is disconnected,the network redundancy is invalid due to the judgment mode of network communication,and the network breakdown is finally feedback.In this paper,the network breakdown fault phenomenon is described,the network system architecture is analyzed,the network communication mechanism and the cause of the fault in the current scheme are explained,and an optimal solution using frame number is proposed.The optimized scheme has been applied in current vehicles and can solve the network breakdown.
分 类 号:TP3[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.131.37.22