粗金粉中金的氯浸-控制电位还原精炼  

Chlorination leaching-controlled potential reduction refining of gold in crude gold powder

在线阅读下载全文

作  者:郭晓亮 邓丰卓 吕超飞 王青丽 张恩华 董文龙 GUO Xiao-liang;DENG Feng-zhuo;LÜChao-fei;WANG Qing-li;ZHANG En-hua;DONG Wen-long(Tongguan Zhongjin Smelting Co.Ltd.,Tongguan 714399,Shaanxi,China;School of Materials Science and Physics,China University of Mining and Technology,Xuzhou 221116,Jiangsu,China;Refractory Gold Concentrate Smelting Engineering Technology Research Center of Henan,Key Laboratory for Gold Smelting Process Research of Sanmenxia,SDIC Jincheng Metallurgy Co.Ltd.,Lingbao 472500,Henan,China)

机构地区:[1]潼关中金冶炼有限责任公司,陕西潼关714399 [2]中国矿业大学材料与物理学院,江苏徐州221116 [3]国投金城冶金有限责任公司河南省难处理金精矿冶炼工程技术研究中心三门峡市黄金冶炼过程研究重点实验室,河南灵宝472500

出  处:《贵金属》2022年第1期54-60,共7页Precious Metals

摘  要:某冶炼厂氰化金泥还原得到的粗金产品纯度较低,采用氯浸-还原工艺对粗金进行了精炼提纯。在生产工艺中采用盐酸+氯酸钠对粗金进行氯浸溶解,用焦亚硫酸钠控制电位选择性还原浸出液中的金。采用补水-冷却使银和铅从氯浸液充分沉淀析出,通过调整pH值、改变焦亚硫酸钠添加方式、精确控制还原电位等方法,产品金锭达到IC-Au99.99标准。两年的生产实践创造了明显的经济效益。The purity of the crude gold powder obtained by reducing cyanide gold slime in a domestic smelter is low,so the crude gold is further refined and purified by the chlorine leaching-reduction process.In the production process,the crude gold is first dissolved by clorination leaching with hydrochloric acid+sodium chlorate,and the gold in the leaching solution is selectively reduced by controlling the potential with sodium metabisulfite.The silver and lead are fully precipitated from the chlorine leaching solution by replenishing water and cooling.By adjusting the pH value,changing the sodium metabisulfite addition method,and accurately controlling the reduction potential,the product gold ingot reaches the IC-Au99.99%standard.Two years of production practice have created obvious economic benefits.

关 键 词:粗金 氯浸 还原 控制电位 焦亚硫酸钠 

分 类 号:TF831[冶金工程—有色金属冶金] TF114

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象