基于时序生产模拟的张家港电网新能源规划  被引量:2

New Energy Planning of Zhangjiagang Power Grid Based on Sequential Production Simulation

在线阅读下载全文

作  者:耿路 王欣怡 周江山 徐怡悦 GENG Lu;WANG Xinyi;ZHOU Jiangshan;XU Yiyue(Jiangsu Electric Power Design Institute Co.,Ltd.,Nanjing 211102,Jiangsu,China)

机构地区:[1]江苏省电力设计院有限公司,江苏南京211102

出  处:《电气传动自动化》2022年第3期59-62,共4页Electric Drive Automation

摘  要:“双碳”目标提出后,张家港电网在江苏省内率先开展了县域能源互联网和新型电力系统建设工作。构建以新能源为主体的新型电力系统需对新能源的接入进行评估和规划。采用时序生产模拟方法,计算张家港地区新能源消纳能力,并分析在不同负荷增长率和不同新能源接入方式下不同新能源装机方案的合理性,从而为张家港地区新能源的广泛接入和规划发展提供技术支撑。After the"double carbon"target was put forward,Zhangjiagang power grid took the lead in the construction of county energy Internet and new power system in Jiangsu Province.To build a new power system with new energy as the main body,it is necessary to evaluate and plan the access of new energy.The sequential production simulation method is used to calculate the new energy consumption capacity of Zhangjiagang area,and analyze the rationality of different new energy installation schemes under different load growth rates and different new energy access modes,so as to provide technical support for the wide access and planning development of new energy in Zhangjiagang area.

关 键 词:时序生产模拟 新能源 消纳 规划 

分 类 号:TM73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象