坚硬顶板回采巷道底鼓控制相似模拟研究  被引量:1

Simulation study on floor heave control of hard roof roadway

在线阅读下载全文

作  者:李忠 Li Zhong(Lu'an Coal Division,Jinneng Holding Coal Group.Changzhi 047500,China)

机构地区:[1]晋能控股煤业集团潞安煤炭事业部,山西长治047500

出  处:《煤炭与化工》2022年第5期6-9,共4页Coal and Chemical Industry

摘  要:为有效治理坚硬顶板回采巷道动压影响下巷道底鼓,以同发东周窑煤矿5103回采巷道为研究背景,利用物理相似模拟试验验证了加强两帮支护强度及安装底角锚杆底鼓控制技术的可行性。现场工业性试验表明,底鼓控制方案安全可靠,为回采巷道底鼓控制提供实践经验。In order to effectively control the floor heave of roadway under the influence of dynamic pressure in hard roof mining roadway,the 5103 mining roadway of Tongfa Dongzhouyao Mine was taken as the research background,the feasibility of strengthening the support strength of two sides and installing the floor heave control technology of bottom angle bolt was verified by physical similarity simulation test.The field industrial test showed that the bottom drum control scheme was safe and reliable,which provided practical experience for the bottom drum control of mining roadway.

关 键 词:巷道底鼓 支承压力 相似模拟 底角锚杆 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象