天津港智能化集装箱码头岸坡稳定研究  

Study on Side Slope Stability Control Measures for the Intelligent Container Terminal in Tianjin Port

在线阅读下载全文

作  者:纪宇阳 Ji Yuyang(Tianjin Jingang Construction Co.,Ltd.,Tianjin 300456,China)

机构地区:[1]天津津港建设有限公司,天津300456

出  处:《港工技术》2022年第S01期35-38,共4页Port Engineering Technology

摘  要:天津港智能化集装箱码头工程为20万t级集装箱码头,码头体量大、施工工期短,多个施工面同时施工。短时间内快速施工对岸坡稳定的要求极高,需要严格进行岸坡稳定控制以保障施工顺利进行。本文通过对工程典型岸坡监测数据超限问题为例,叙述了现场进行的严格工况分析以及采取有效的控制措施,保障了工程建设过程中的岸坡稳定,对工程顺利开展并按时完工起到了很大促进作用。The intelligent container terminal in the Tianjin Port is designed to accommodate 200000 DWT container carriers.For the terminal construction,the work quantity is huge,the construction period is short,and operations should be carried out at many work places simultaneously.In this case,the side slope of the work places is required to make extremely stable,so that the slope stability should be strictly controlled for the smooth progress of construction.Taking some typical over-limited side slope data monitored on site during the project development as an example,this paper describes in detail the strict working condition analysis and effective control measures taken at the site for the bank slope stability,which plays a great role in promoting the smooth development and timely completion of the project.

关 键 词:天津港 工期短 岸坡稳定控制 监测数据超限 工况分析 控制措施 

分 类 号:U656.135[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象