检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲁礼慧 Lu Lihui(Shanghai investigation,design&Research Institute Co.,Ltd.,Shanghai 200434,China)
机构地区:[1]上海勘测设计研究院有限公司,上海200434
出 处:《吉林水利》2022年第4期14-17,21,共5页Jilin Water Resources
摘 要:在河床式厂房整体稳定计算中,基底扬压力是主要荷载之一。依托乌干达伊辛巴水电站项目,对河床式厂房整体稳定计算中的扬压力折减系数取值进行研究,比较了中美两国规范对于扬压力折减系数的取值规定。将扬压力设计计算值与渗压计的实测值进行了对比分析,探讨了扬压力折减系数设计取值中存在的问题,提出了新的计算方法,可以为类似工程提供参考。Uplift pressure along the base is one of the main loads in stability calculation of run-of-river powerhouse.The uplift pressure reduction factor in stability calculation of run-of-river powerhouse is studied based on Isimba Hydropower Station in Uganda.Provisions about uplift pressure reduction factor of Chinese codes and American codes are compared with each other.Design values of uplift pressure are compared with monitoring values.With that,existing problems in the design value of uplift pressure reduction factor and new calculation method are put forward,which can be referred by similar engineering.
分 类 号:TV731.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49