检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘东林 刘艳妍[1] Liu Donglin;Liu Yanyan(School of Mechatronic Engineering,Lanzhou Jiaotong University,Lanzhou 730070,China)
机构地区:[1]兰州交通大学机电工程学院,甘肃兰州730070
出 处:《锻压技术》2022年第5期175-180,共6页Forging & Stamping Technology
基 金:国家自然科学基金资助项目(51265022);甘肃省科技计划资助项目(145RJZA187)。
摘 要:针对双柱上推式锻造液压机,分析了在锻造过程中存在的偏载工况,研究了偏载的传递路径,明确了纵向偏载总是存在的客观性。建立了双柱预应力机架的力学模型,分析了在偏载作用下机架的受力状态。结合对机架工作过程的研究,确定了预应力的计算方法。实例计算结果表明:锻造偏心距从100 mm增至250 mm,机架的预紧系数分别从横向偏载工况下的1.12增至1.45、从纵向偏载工况下的1.14增至1.77,机架在纵向偏载工况下为了保证自身整体性所需的预应力更大。通过仿真分析进一步比较立柱与下梁间接合面的闭合状态,结果表明:相较于横向偏载工况,机架在纵向偏载工况下更易开缝且最大缝隙更大;对于纵向偏载工况,立柱的纵向挠度随着预紧系数的增加显著减小,且预紧系数增至1.8时,最大缝隙趋于0 mm,验证了计算方法的可行性。并基于偏载工况与预应力机架的研究,提出了在机架预应力的计算过程中有必要考虑纵向偏载产生的影响。For the double-column push-up forging hydraulic press,the eccentric load condition in the forging process was analyzed,the transfer path of eccentric load was studied,and the objectivity that the vertical eccentric load always exists was clarified.Then,the mechanical model of double-column prestressed frame was established,and the stress state of frame under the eccentric load was analyzed.Combined with the research on the working process of the frame,the calculation method of prestress was determined.The example calculation results show that the forging eccentricity increases from 100 mm to 250 mm,the pretension coefficient of the frame increases from 1.12 to 1.45 under the horizontal eccentric load condition and from 1.14 to 1.77 under the vertical eccentric load condition,and the prestress of the frame is greater to ensure its integrity under the vertical eccentric load condition.Through the simulation analysis,the closed state of indirect joint surface between column and lower beam was further compared.The results show that compared with the horizontal eccentric load condition,the frame is easier to crack under the vertical eccentric load condition,and the maximum gap is larger.For the vertical eccentric load condition,the vertical deflection of column decreases significantly with the increasing of the pretension coefficient,and when the pretension coefficient increases to 1.8,the maximum gap tends to 0 mm,and the feasibility of the calculation method is verified.Based on the study of eccentric load condition and prestressed frame,it is suggested that it is necessary to consider the influence of vertical eccentric load in the calculation process for the frame prestress.
关 键 词:双柱液压机 预应力机架 偏载工况 纵向偏载 预应力 预紧系数
分 类 号:TG315[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.227.102.59