检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘福广[1] 杨二娟[1] 李勇[1] 米紫昊[1] 王艳松 刘刚[1] 雒晓涛[2] LIU Fuguang;YANG Erjuan;LI Yong;MI Zihao;WANG Yansong;LIU Gang;LUO Xiaotao(Xi’an Thermal Power Research Institute Co.,Ltd.,Xi’an 710054,China;State key Laboratory for Mechanical Behavior of Materials,Xi’an Jiaotong University,Xi’an 710049,China)
机构地区:[1]西安热工研究院有限公司,陕西西安710054 [2]西安交通大学金属材料强度国家重点实验室,陕西西安710049
出 处:《热力发电》2022年第6期74-81,共8页Thermal Power Generation
基 金:中国华能集团公司总部科技项目(HNKJ20-H47;TN-20-TYK09)。
摘 要:高可靠性的蒸汽发生器堵管技术是核电站安全运行的重要保障,与压水堆相比,以高温气冷堆为代表的第四代核电技术由于蒸汽发生器内传热管服役温度显著提高,对现有的蒸汽发生器堵管技术提出了新的挑战。对此,本文首先基于国内外文献报道,总结了现有压水堆蒸汽发生器堵管技术的工作原理与技术特点;其次,总结了国内外蒸汽发生器自动化堵管系统的开发与应用现状;之后,就高温气冷堆蒸汽发生器的服役工况与场地条件,提出了现有堵管技术在高温气冷堆应用方面面临的挑战及改进方向;最后,针对堵管技术的发展现状与高温气冷堆的技术需求,从装备要求、施工可行性和堵头质量的长期有效性等方面指明了自动化堵管技术的发展方向,以期为高温气冷堆蒸汽发生器自动化堵管技术的发展提供借鉴。High reliable automatic heat-exchange tube plugging process for stream generator(SG) is always critical to safe operation of nuclear power reactor.Compared with the pressurized water reactor(PWR),the much higher pressure and temperature in heat-exchange tubes in SG of high temperature gas-cooled reactor(HTGR) brings new challenge to the present plugging processes.To solve this problem,the working principle,characteristics,advantages and disadvantages of the present tube plugging processes are firstly summarized based on the literature survey.Then,applicability of mechanical plugging processes and welding plugging processes on SG of HTGR is discussed,according to the service conditions and site conditions of the SG in HTGR,the challenges and improvement directions of the existing tube plugging process in high temperature gas cooled reactor are proposed.Finally,based on the development progress of tube plugging process and technical requirement of high temperature gas-cooled reactor,the development direction of automatic tube plugging technology is pointed out in terms of equipment requirement,operation reliability and long-term service performance of plug.It is attempted that the present review work can guide the development of automatic plugging techniques for SG in HTGR.
关 键 词:核电站 高温气冷堆 蒸汽发生器 机械堵管 焊接堵管
分 类 号:TL48[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249