检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李娜 Li Na(The Fourth Project Co.,Ltd.,of China Railway Bureau 14 Group,Ji'nan 250000,China)
机构地区:[1]中铁十四局集团第四工程有限公司,山东济南250000
出 处:《科学技术创新》2022年第18期119-122,共4页Scientific and Technological Innovation
摘 要:监控量测在隧道施工管理过程中极其重要,是隧道施工的主要技术管控措施,监测结果主要用于验证设计参数、施工方案是否满足设计及规范要求。通过运用收敛仪配合全站仪的方法来实时监测软岩隧道的净空收敛及拱顶沉降。通过分析并总结软岩隧道的净空收敛及拱顶沉降数据来反应现场围岩稳定性情况,来指导现场施工,保障隧道顺利贯通。Monitoring and measurement is extremely important in the process of tunnel construction management.It is the main technical control measure of tunnel construction.The monitoring results are mainly used to verify whether the design parameters and construction scheme meet the design and specification requirements.The clearance convergence and vault settlement of soft rock tunnel are monitored in real time by using convergence instrument and total station.By analyzing and summarizing the clearance convergence and vault settlement data of soft rock tunnel,we can reflect the stability of surrounding rock on site,guide the on-site construction and ensure the smooth connection of the tunnel.
分 类 号:U456[建筑科学—桥梁与隧道工程] U459.2[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222