检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王宏权 WANG Hong-quan(Guangdong Nanyue Transportation Investment and Construction Co.,Ltd.,Guangzhou,Guangdong 510000,China)
机构地区:[1]广东省南粤交通投资建设有限公司,广东广州510000
出 处:《黑龙江交通科技》2022年第5期5-9,共5页Communications Science and Technology Heilongjiang
摘 要:为研究粤东山区高液限土路堤强夯处理效果,以大(埔)丰(顺)(五)华高速公路丰顺至五华段典型高液限土路堤为依托,基于试验段现场实测数据,分析了强夯后路堤压实度变化情况,总结了点夯和满夯施工后路堤总体沉降规律,通过对比不同夯击能下夯击沉降差与夯击击数关系曲线,得到了不同夯击能下终锤标准的点夯击数,为今后粤东山区类似条件下高速公路路堤强夯设计与施工提供了借签和参考。In order to research the treatment effect of dynamic compaction test in high liquid limit soil embankment,which is wide spread in mountains of east Guangdong Province,relying on the typical high liquid limit soil embankment of Dabu Fengshun Wuhua extra-long highway in the road section of Fengshun to Wuhua,based on the results of test section,analyzed the change on compactness of embankment after dynamic compaction treatment,summarized the rules of embankment subsidence after point compaction test and full compaction test.By comparing the relationship between the subsidence difference and tamping times under different tamping energy,obtained the tamping times of different tamping energy in point compaction test,which can provide reference for the design and construction of similar project in mountains of east Guangdong Province in the future.
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.57