检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蓝晓君 LAN Xiao-jun(Guangxi Water and Power Design Institute Co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023
出 处:《广西水利水电》2022年第3期38-40,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:多泥沙流域建水电站,若没有做好排沙措施,不仅会导致有效库容减少,增加防洪压力,库尾淤积上延还会导致河道两岸被淹没,影响到水电站的使用寿命,而且泥沙淤积会导致大坝本身防渗性能大大下降,影响大坝结构安全。因此排沙是水电站设计中一项很重要的部分。本文介绍了尼泊尔中西部Jajarkot地区Bheri河中上游一水电站排沙的设计和运行方式。If sand flushing facility is not properly designed for a hydropower station on sediment-laden river,the effective storage capacity of reservoir will decrease;the flood control pressure will increase;the siltation at the reservoir tail will lead to the inundation on both banks;the service life of hydropower station will be influenced;sediment deposition will greatly reduce the anti-seepage performance of the dam itself and affect the safety of the dam structure.Therefore,sediment discharge design of hydropower station is very important.An introduction was made on the design and operation mode of the sediment discharge structures of a hydropower station located on the middle and upper reaches of the Bheri River in Jajarkot district in central and western Nepal.
分 类 号:TV673[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.163.142