检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赖成联[1] LAI Cheng-lian(Guangxi Water and Power Design Institute Co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023
出 处:《广西水利水电》2022年第3期48-52,共5页Guangxi Water Resources & Hydropower Engineering
摘 要:介绍了旺盛江水库第二溢洪道滑坡体初设加固方案的设计分析与比选计算的内容。通过计算分析论证了边坡稳定性存在的问题,提出了削方减载方案、抗滑桩方案和格构锚固方案3种边坡加固的初设方案,并结合工程实际条件对各方案进行了设计和比选分析。结果表明,推荐采用的抗滑桩方案在工程安全、施工技术和投资成本方面有很大优势。An introduction was made on the design,analysis,comparison and calculation of initial reinforcement schemes for the landslide of the second spillway of Wangshengjiang Reservoir.The existence of slope stability problem is proved by calculation and analysis.Three initial slope reinforcement schemes are proposed including the cutting square and reducing load scheme,anti-slide pile scheme and lattice anchorage scheme.Combined with the actual engineering conditions,the proposed schemes were designed and compared.The results of comparison demonstrate the recommended anti-slide pile scheme has great advantages in engineering safety,construction technology and investment cost.
关 键 词:溢洪道 边坡稳定 削方减载 抗滑桩 格构锚固 设计比选 旺盛江水库
分 类 号:P642.22[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28