检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁献[1] 张明[1] 樊冠桥[1] LIANG Xian;ZHANG Ming;FAN Guan-qiao(Guangxi Water and Power Design Institute Co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023
出 处:《广西水利水电》2022年第3期68-71,74,共5页Guangxi Water Resources & Hydropower Engineering
摘 要:广西洋溪水利枢纽工程洪峰流量大、防洪调度复杂,溢流坝和船闸闸门设计水头和操作水头大、总水压力大,启闭机容量大。本文对洋溪水利枢纽金属结构设计的关键技术进行了分析研究,提出设计中需要重点考虑的问题和解决方案。Yangxi Hydropower Project in Guangxi is characterized by high flood peak flow and complicated flood control function.Its overflow dam and shiplock are designed with gates of high design head,high operating head,high total water pressure and high hoisting capacity.The authors analyzed and studied the key technology of metal structure design,and discussed the issues in need of special attention as well as the solutions.
分 类 号:TV34[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.70.193