检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯树荣 洪文浩[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 潘江洋[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 许唯临 胡亚安 张永涛[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 王毅华[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 王毅 吴小云[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 曾祥喜 苏军安[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 黄文利[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 周伟 张建民[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 胡大可[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 盛乐民[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 张建山 张成平 王雄武[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 练继建[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 钟辉亚[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 胡伟明[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 李悦[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 王恩志[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 胡斌[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 周红波 王可[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 钱向东 高鹏[1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17] 张金婉
机构地区:[1]中国三峡建工(集团)有限公司 [2]中国电建集团中南勘测设计研究院有限公司 [3]四川大学 [4]水利部交通运输部国家能源局南京水利科学院 [5]中国水利水电科学研究院 [6]武汉大学 [7]中国葛洲坝集团股份有限公司 [8]长江设计集团有限公司 [9]清华大学 [10]河海大学 [11]天津大学 [12]成都理工大学 [13]长江水利委员会长江科学院 [14]重庆交通大学 [15]中国科学院武汉岩土力学研究所 [16]中国水利水电第八工程局有限公司 [17]中国水利水电第四工程局有限公司
出 处:《中国科技成果》2022年第8期52-53,共2页China Science and Technology Achievements
摘 要:金沙江向家坝水电站是金沙江规划的最末梯级,为国家“西电东送”的骨干电源。工程以发电为主,同时改善航运条件,兼顾防洪、灌溉,并具有拦沙和对溪洛渡水电站进行反调节等作用,是金沙江干流仅有的具有超大型农田灌溉、过坝通航等多功能的综合枢纽工程。项目的建设对保障国家能源安全、提高流域水资源利用效率、促进西南地区水运通江达海。
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.11.68