检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何翊 张广泰[1] HE Yi;ZHANG Guang-tai(College of Architecture and Civil Engineering,Xinjiang University)
机构地区:[1]新疆大学建筑工程学院
出 处:《智能建筑与智慧城市》2022年第6期90-92,共3页Intelligent Building & Smart City
摘 要:现今钢结构在我国广泛应用,在确保安全、质量的前提下,稳步加快施工周期显得越来越重要。通过BIM技术的相关应用,对钢结构现场安装组织和构件拼装提前考虑,极大地提升了现场的管理效率。通过对钢结构及相关专业进行深化设计,将二维问题转化为三维前置解决,避免单专业未优化导致的局限性,从而确定最优方案。Nowadays,steel structures are widely used in our country,and it is becoming more and more important to steadily speed up the construction cycle under the premise of ensuring safety and quality.Through the relevant application of BIM technology,the onsite installation organization and component assembly of steel structures are considered in advance,which greatly improves on site management efficiency.Through in-depth design of steel structure and related disciplines,two-dimensional problems are transformed into three-dimensional pre-solutions,to avoid the limitations caused by unoptimized single majors,so as to determine the optimal plan.
关 键 词:异形复杂大空间钢结构 BIM技术 深化设计 施工模拟 方案选型
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.156.144