检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘刊[1] 吕赫 赵海阔[1] LIU Kan;LYU He;ZHAO Hai-kuo
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2022年第5期62-65,72,共5页Water Resources & Hydropower of Northeast China
基 金:《水利水电工程施工组织设计规范》编制关键技术研究项目(SL 303-2004)。
摘 要:吉林省中部城市引松供水工程为大型引调水工程,主要施工方式为开挖埋管回填。地基验收是工程必不可少的环节,实际工作生产过程中发现,施工期轻型动力触探数值远小于勘察期试验数值,根据轻型动力触探定量判断是否满足验收普遍存在争议。现特对此现象进行讨论。The Central City Water Supply Project of Jilin Province is a large-scale water diversion project, and the main construction method is excavation and backfilling of buried pipes. Foundation acceptance is an essential part of the project. It is found in the actual work and production process that the light dynamic penetration value during the construction period is far less than the test value during the investigation period. It is generally controversial to judge whether the acceptance is satisfied according to the light dynamic penetration quantity. This phenomenon is now discussed.
关 键 词:工程地质 轻型动力触探试验 基槽验收 引松供水 吉林省
分 类 号:TV212.2[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.36