设计企业总承包如何避免设计施工“两张皮”——项目经理负责制探究  

Discussion and Study on Project Manager Responsibility System How to Avoid"Two Skins"for Design and Construction in General Contracting of Design Enterprises

在线阅读下载全文

作  者:石树琴 SHI Shuqin

机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092

出  处:《城市道桥与防洪》2022年第4期167-169,M0015,共4页Urban Roads Bridges & Flood Control

摘  要:针对设计企业工程总承包设计、施工“两张皮”问题,分析了产生“两张皮”现象的四方面原因,针对设计企业工程总承包业务发展存在的弱矩阵管理模式客观导致项目协调沟通困难等四类问题,提出了设计企业实行项目经理负责制模式建议。Aiming at the"two Skins"for the design and construction in the general contracting of design enterprises,four causes of"two skins"are analyzed.Specific to four kinds of problems that the weak matrix management mode objectively leads to the project coordination and communication difficulties existing in the development of the general contracting business of design enterprises,the suggestions for the project manager responsibility system mode in the design enterprises are proposed.

关 键 词:设计 施工 工程总承包 项目经理 项目管理 

分 类 号:TU99[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象