检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘瑞贵 宋先琴 伍继红 陈东 邹力 LIU Ruigui;SONG Xianqin;WU Jihong;CHEN Dong;ZOU Li(Anshun Power Supply Bureau of Guizhou Power Grid Co.,Ltd.,Guizhou Pingba,561000)
机构地区:[1]贵州电网有限责任公司安顺供电局,贵州平坝561000
出 处:《农村电气化》2022年第6期13-17,共5页Rural Electrification
摘 要:通过零序电流采样异常的分析,反应出客户产权的分界开关在功能上配置不合理,选取简易的“合成零序”保护作为接地故障的主保护,将增加保护的误动概率。大量的现场实例证明采用“独立零序TA”配置的分界开关,能精确的采集微小的零序电流(俗称电容电流),有利于零序电流保护准确整定计算,能确保正确动作率达100%,且零序电流保护整定计算方法对配网人员现场快速整定计算具有一定的指导意义。Through the analysis of the abnormal sampling of zero sequence current,it is reflected that the boundary switch of customer property right is not configured reasonably in function.Selecting the simple"synthetic zero sequence"protection as the main protection of grounding fault will increase the false alarm rate of protection.A large number of field examples show that the boundary switch with"independent zero sequence CT"configuration can accurately collect small zero sequence current(commonly known as capacitive current),which is conducive to the accurate setting calculation of zero sequence current protection,and can ensure that the correct action rate reaches 100%,and the setting calculation method of zero sequence current protection has certain guiding significance for the on-site rapid setting calculation of distribution network personnel.
分 类 号:TM727.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145