作 者:刘远建 LIU Yuan-jian(China Railway Development&Investment Co.,Ltd.,Qingdao 266034,China)
出 处:《价值工程》2022年第20期77-79,共3页Value Engineering
摘 要:以青岛地铁6号线创智谷站为例,提出了“分部台阶法-预应力锚杆”为核心的主动支护施工工法。主要得出以下结论:①提出分部台阶法开挖方案,预应力锚杆为核心的主动支护施工技术;②建立FLAC3D数值模型,证明主动支护提供径向应力改善围岩条件,有效控制了塑性区半径,减小掌子面的影响范围,降低地面的扰动区域;③主动支护体系拱顶沉降变形值最大为-5.0mm,锚杆轴力受开挖扰动低,围岩变形控制效果良好,初支结构安全储备高。Taking Qingdao Metro Line 6 Chuangzhi Valley Station as an example,the active support construction method with"divisional step method and prestressing anchor"as the core was proposed.The main conclusions are as follows:①The active support construction technology with the divisional step excavation scheme and prestressed anchor rod as the core is proposed;②The FLAC3D numerical model is established to prove that the active support provides radial stress to improve the surrounding rock conditions,effectively controls the radius of the plastic zone,reduces the influence range of the palm face,and reduces the ground disturbance area;③The maximum settlement deformation value of the vault of the active support system is-5.0mm,the axial force of anchor rod is disturbed by excavation,the deformation of surrounding rock is well controlled,and the safety reserve of primary support structure is high.
关 键 词:大跨度隧道 施工技术 预应力锚杆 数值分析 变形控制
分 类 号:TD744[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28