检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:方泞 FANG Ning(China Three Gorges Corporation,Chengdu 610000,China)
机构地区:[1]中国长江三峡集团有限公司,四川成都610000
出 处:《云南水力发电》2022年第6期17-20,共4页Yunnan Water Power
摘 要:大型水电工程建设征地移民人口界定工作,涉及面广、政策性强,是关系到移民搬迁安置工作顺利开展的重要环节,更是涉及移民切身利益的焦点问题。以乌东德水电站云南省建设征地移民人口界定工作为例,介绍了移民人口界定工作的依据、范围和工作程序,提出了界定工作中存在的问题,并探索了界定工作的思路和方法。Definition of immigrant population for land acquisition in large-scale hydropower projects involves a wide range of areas and strong policies,which is an important link for the smooth development of resettlement and relocation work,and also a focal issue involving the vital interests of immigrants.Taking the definition of resettlement population for land acquisition in Yunnan Province of Wudongde Hydropower Station as an example,this paper introduces the basis,scope and working procedure of the definition of resettlement population,puts forward the existing problems in the definition,and explores the ideas and methods for the definition.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.180.18