检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘远灵 LIU Yuan-ling(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Liyuan Power Generation Branch,Lijiang 674100,China)
机构地区:[1]云南华电金沙江中游水电开发有限公司梨园发电分公司,云南丽江674100
出 处:《云南水力发电》2022年第S01期44-46,共3页Yunnan Water Power
摘 要:因高压熔断器异常引起的电压互感器二次测量电压异常,在行业内部时有发生,威胁着各设备系统安全稳定运行,结合梨园电厂18kV电压互感器高压熔断器熔断分析处理实践,从高压熔断器熔断外部、内部原因分析,熔断器“慢熔”对励磁系统、发电机保护系统、机组测量、计量、监控系统的影响等方面入手,提出了高压熔断器熔断及“慢熔”的应对策略。Secondary measurement voltage anomaly of voltage transformer caused by abnormal high voltage fuse occurs from time to time in the industry,threatening the safe and stable operation of all equipment systems.This paper analyses the fusing problem of 18 kV voltage transformer high voltage fuse in Liyuan Power Plant.Based on the analysis of external and internal causes of high-voltage fuse fusing,the corresponding strategies of highvoltage fuse fusing and slow fusing are put forward in the aspects of influence of fuse slow fusing on excitation system,generator protection system,unit measurement,metering and monitoring system.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.232.123