阶段空场嗣后充填连续采矿法在多层缓倾斜矿体中的应用  被引量:3

Application of Staged Open Field Post-Minging Filling Continuous Minging Method in Multi-Layer Gently Dipping Orebodies

在线阅读下载全文

作  者:严体 廖庆永 李在利 YAN Ti;LIAO Qing-yong;LI Zai-li(Yunnan Copper Mining Research Institute,Kunming 650000,Yunnan,China;Yuxi Mining Co.,Ltd.,Yuxi 653100,Yunnan,China)

机构地区:[1]云南铜业矿山研究院,云南昆明650000 [2]玉溪矿业有限公司,云南玉溪653100

出  处:《中国钼业》2022年第3期20-23,共4页China Molybdenum Industry

摘  要:针对缓倾斜、多层矿体平行产出的特征,前期采用分段空场法、大直径深孔崩矿空场嗣后充填法,存在无法实现对盘区间柱的回收,矿石损失率较大,造成极大的资源浪费。根据矿体特点,将相邻的多盘区作为一个整体“大区”进行综合考虑,即采用连续开采模式,提出了大盘区阶段空场嗣后充填连续采矿法,具有资源回收率高、开采效率高、采场结构优化、废石不出坑与低成本充填等优点,可实现井下采矿作业集中化,促进矿柱资源的回收利用,延长矿山服务年限。In view of the characteristics of gently dipping and parallel production of multi-layer ore bodies,the sublevel open stope method and the large-diameter deep hole ore caving open stope filling method were adopted in the early stage,which could not realize the recovery of the panels pillar,and the ore loss rate was relatively large,resulting in a great waste of resources.According to the characteristics of the ore body,the adjacent multi-panel areas are considered as a whole"large area",that is,the continuous mining mode is adopted,and the continuous mining method of open stope and post-mining filling in the large-panel area stage is proposed,which has the advantages of high resource recovery rate and mining efficiency.The advantages of high height,stope structure optimization,no waste rock pits and low-cost filling,etc.realize the centralization of underground mining operations,promote the recycling and utilization of ore pillar resources,and prolong the service life of the mine.

关 键 词:缓倾斜矿体 连续开采 大盘区空场嗣后充填 胶结充填 矿柱 

分 类 号:TD853.21[矿业工程—金属矿开采] TD853.32[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象