检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐林春[1,2,3] 胡良和 黄东[1,2,3] 林美兰[1,2,3] 刘画眉 李海彬[1,2,3] 何书琴 宫鹏杰[1,2,3] XU Linchun;HU Lianghe;HUANG Dong;LIN Meilan;LIU Huamei;LI Haibin;HE Shuqin;GONG Pengjie(Guangdong Research Institute of Water Resources and Hydropower, Guangzhou 510635, China;Guangdong Key Laboratory of Hydrodynamic Research, Guangzhou 510635, China;Guangdong Provincial Science and Technology Collaborative Innovation Center for Water Safety, Guangzhou 510635, China;China Water Resources Pearl River Planning, Surveying & Designing Co.,Ltd., Guangzhou 510610, China)
机构地区:[1]广东省水利水电科学研究院,广州510635 [2]广东省水动力学应用研究重点实验室,广州510635 [3]广东省水安全科技协同创新中心,广州510635 [4]中水珠江规划勘测设计有限公司,广州510610
出 处:《广东水利水电》2022年第6期55-59,共5页Guangdong Water Resources and Hydropower
基 金:广东省水利科技创新项目(编号:2015-09);广东省软科学研究计划项目(编号:2018B020207004)。
摘 要:针对林芝市高山峡谷地带的区域地貌特点以及生态保护和经济社会发展的实际需求,对林芝市河道管理范围内跨河、穿河穿堤、临河建设项目的主要技术要求进行了分析研究,提出了与平原网河区地带和经济发达地区不同的控制指标。提出的技术要求有针对性和可操作性,可为林芝市涉河建设项目行政许可和保障河道防洪安全提供相应的技术支撑。In this paper,according to the regional geomorphic characteristics of the alpine Canyon zone in Nyingchi City and the actual needs of ecological protection and economic and social development,the main technical requirements of construction projects within the scope of management for river courses such as construction cross the river,construction through the river or levee,construction nearby the river,is analyzed and studied.The control indexes different from those in plain river network areas and economically developed areas are put forward.The proposed technical requirements are targeted and operable,which can provides technical support for the administrative license of construction projects related river and the flood control safety of river courses.
分 类 号:TV85[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28