检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘建华 赵华军 LIU Jian-hua;ZHAO Hua-jun(China Coal Technology&Engineering Group Chongqing Research Institute Co.,Ltd.,Chongqing 400037,China)
机构地区:[1]中煤科工集团重庆研究院有限公司,重庆400037
出 处:《煤炭科技》2022年第3期97-99,共3页Coal Science & Technology Magazine
摘 要:榆树田煤矿下_(5)煤层认定为煤与瓦斯突出煤层,煤巷掘进工作面采用定向长钻孔预抽煤巷条带煤层瓦斯区域防突措施。根据对相邻下_(5)煤层掘进工作面瓦斯赋存情况以及抽采半径考察,设计了110503运输巷顺层定向长钻孔预抽施工方案,抽采期间瓦斯平均浓度达到50%以上,钻场抽采量平均4.9 m^(3)/min,抽采后煤层残余瓦斯含量最高4.56 m^(3)/t,防突区域验证指标合格,保证了安全掘进,为煤层掘进工作面防止煤与瓦斯突出提供安全保障。The lower_(5) coal seams of Yushutian Coal Mine are identified as coal and gas outburst coal seams,and the coal roadway excavation working face adopts directional long-drilling pre-draining coal roadway strip coal seam outburst prevention measures.According to the investigation of the gas occurrence and the extraction radius of the adjacent lower_(5) coal seam excavation working face,the pre-drainage construction plan of the 110503 transportation roadway along the layer with the directional long hole was designed.The average gas concentration during the extraction period reaches more than 50%,and the drilling site the average extraction volume was 4.9 m^(3)/min,and the maximum residual gas content of the coal seam after extraction was 4.56 m^(3)/t.The verification index of the outburst prevention area was qualified,which ensured safe excavation and prevents coal from gas highlights provide security.
分 类 号:TD712.6[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33