长沙县某大型水厂集约化工艺设计与运行  

Design and Operation of Intensive Process of a Large-scale Waterworks in Changsha County

在线阅读下载全文

作  者:陈蕃[1,2] 卢文静 邹琳 李漫[1] 刘介源 黄帆 CHEN Fan;LU Wen-jing;ZOU Lin;LI Man;LIU Jie-yuan;HUANG Fan(China Machinery International Engineering Design&Research Institute Co.Ltd.,Changsha 410007,China;Hunan Engineering Research Center for Water Treatment Process&Equipment,Changsha 410007,China;Changsha Economic and Technical Development Zone Water Purification Engineering Co.Ltd.,Changsha 410100,China)

机构地区:[1]中机国际工程设计研究院有限责任公司,湖南长沙410007 [2]湖南省水处理过程与装备工程技术研究中心,湖南长沙410007 [3]长沙经济技术开发区水质净化工程有限公司,湖南长沙410100

出  处:《中国给水排水》2022年第10期112-115,共4页China Water & Wastewater

基  金:湖南省高新技术产业科技创新引领计划项目(2020SK2042、2022GK4062);湖南省重点研发计划项目(2022SK2067)。

摘  要:长沙县某水厂现状规模为5×10^(4) m^(3)/d,采用常规水处理工艺,存在供水规模不足、水源水质恶化、出水水质较差等问题。一期改扩建工程规模10×10^(4) m^(3)/d,针对现状用地紧缺及微污染原水的特点,采用“预臭氧+ACTIFLO沉淀池+TGV滤池+消毒”组合水处理工艺,并进行集约化设计,有效解决污染原水处理困难、现有工艺滞后、工程扩建用地不足以及运行超负荷等问题。运行结果表明,出水水质优于《生活饮用水卫生标准》(GB 5749—2006),占地面积仅为国家建设标准的40%,废水循环利用后年节约耗水量137×10^(4) m^(3),工程总投资与类似项目相比节省30%左右。The current scale of a waterworks in Changsha County is 5×10^(4) m^(3)/d,adopting conventional purification technology.There are some problems such as insufficient capacity of water supply,deterioration of source water quality and poor effluent quality.The scale of the phaseⅠreconstruction and expansion project is 10×10^(4) m^(3)/d.In view of the current shortage of land and the characteristics of micro-polluted raw water,the combined purification process consisting of pre-ozonation,ACTIFLO sedimentation tank,TGV filter and disinfection was adopted and the intensive design was carried out to effectively solve the problems such as difficult treatment of the polluted raw water,the lag of the existing technology,insufficient land for project expansion and overload operation.The product water quality of the project is better than the limitations specified in Standards for Drinking Water Quality(GB 5749-2006).The footprint area is only 40%of the national construction standard,the annual water consumption saving after wastewater recycling is 137×10^(4) m^(3),and the total investment of the project is approximately 30%less than that of similar projects.

关 键 词:大型水厂 ACTIFLO沉淀池 TGV滤池 

分 类 号:TU991[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象