检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王海宁 王正莹 慕子煜 李泽洲 WANG Haining;WANG Zhengying;MU Ziyu;LI Zezhou(East China Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Shanghai 200333,China)
机构地区:[1]中国电力工程顾问集团华东电力设计院有限公司,上海200333
出 处:《电力勘测设计》2022年第6期1-5,共5页Electric Power Survey & Design
摘 要:EPC总承包物资采购在采用综合评估法选取评标权重时,如果过于依靠经验、选取随意,致评标结果失真。而层次分析法是定性与定量相结合的科学的决策分析方法,基于层次分析法,对EPC总承包物资采购的评标权重选取进行探讨。When the comprehensive evaluation method is used to select the evaluation weight of EPC material procurement,it is often too dependent on experience and random selection,resulting in the distortion of evaluation results.The analytic hierarchy process is a scientific decision-making analysis method combining qualitative and quantitative analysis.Based on the analytic hierarchy process,this paper discusses the selection of evaluation weight of EPC material procurement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117