永圣渡槽组合止水安装施工工法研究  被引量:3

Study on Installation and Construction Method of Combined Water Stop in Yongsheng Aqueduct

在线阅读下载全文

作  者:张红霞[1] 刘剑[1] 陈崇德[1] ZHANG Hongxia;LIU Jian;CHEN Chongde(Hubei Zhanghe Engineering Administration Bureau,Jingmen 448156,China)

机构地区:[1]湖北省漳河工程管理局,湖北荆门448156

出  处:《中国水能及电气化》2022年第5期12-16,共5页China Water Power & Electrification

摘  要:文章根据湖北省漳河水库灌区永圣等渡槽拆除重建工期紧、任务重的实际情况,研究了渡槽组合止水安装施工工法。并对该工法的工艺原理,施工工艺流程,施工过程及操作要点,工法特点等进行了阐述,对应用实例中质量、安全、环境保护措施和应用效益进行了分析,对于指导同类型渡槽施工,具有一定的借鉴作用。The installation and construction method of aqueduct combined water stop is studied in the paper in accordance with the actual situation of tight construction period and heavy task of Yongsheng Aqueduct removal and reconstruction in Zhanghe Reservoir Irrigation Area,Hubei Province.The process principle,construction technology process,operation keys,method characteristics and other aspects of the method are described.The quality,safety,environmental protection measures and application benefits of the application examples are analyzed,which can be used for reference to guide the construction of similar aqueducts.

关 键 词:组合止水 安装 工法研究 永圣渡槽 

分 类 号:TV672.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象