铜川市水库清淤扩容技术可行性研究浅析  被引量:2

Analysis on Feasibility Study of Dredging and Expansion Technology in Tongchuan Reservoir

在线阅读下载全文

作  者:由灿 邬登成 YOU Can;WU Dengcheng(CCCC Water Resources and Hydropower Construction Co.,Ltd.,Ningbo 315200,China)

机构地区:[1]中交水利水电建设有限公司,浙江宁波315200

出  处:《中国水能及电气化》2022年第5期32-36,42,共6页China Water Power & Electrification

摘  要:为了解决铜川市境内水库淤积的问题,采用实地踏勘和无人机无人船测绘相结合的方式调研铜川市境内各水库淤积现状和周边地形环境,结合历史资料分析,提出铜川市境内水库清淤扩容的整体规划和技术可行性,最终选择合适的清淤技术和底泥处理方法,恢复现有水库库容,使现有水库能够发挥其本来的防洪调蓄等功能效益,以利于铜川市当地的生态和经济的可持续发展。The field reconnaissance and unmanned aerial vehicle(UAV) unmanned ship are combined for surveying the present situation of reservoir siltation and the surrounding terrain environment in Tongchuan in order to fundamentally solve the problems left over by history about reservoir sedimentation in Tongchuan.The historical data analysis is combined to propose the overall plan and technical feasibility of reservoir dredging and expansion in Tongchuan.Finally,appropriate dredging technology and sediment treatment methods are selected to restore the capacity of the existing reservoir so that the existing reservoir can play its original flood control,storage regulation and other function benefits,thereby benefiting the sustainable development of the local ecology and economy of Tongchuan.

关 键 词:淤积现状 整体规划 水下清淤 环保疏浚 

分 类 号:TV697.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象