检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈慧琴 Chen Huiqin(Xiamen Municipal Baicheng Management Consulting Co.Ltd.,Xiamen,Fujian 361000)
机构地区:[1]厦门市政百城管理咨询有限公司,福建厦门361000
出 处:《江西建材》2022年第5期288-289,共2页Jiangxi Building Materials
摘 要:市政工程竣工结算时,需严格按照招标文件与合同规定,调整实际发生的变更内容与材料价格,增减工程量与新增价格计算等。文中介绍了市政工程竣工结算审核的意义,阐述了审核依据,提出了几点优化措施。When the municipal project is completed and settled, it must be adjusted in strict accordance with the bidding documents and contract regulations, the actual changes and material price adjustments, the increase or decrease of the project quantity, and the calculation of the new price. This paper first introduces the value and significance of the completion and settlement audit of municipal engineering, then elaborates the basis for the completion audit, and finally puts forward some optimization measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4