检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:洪开荣 刘永胜 杨朝帅 潘岳 HONG Kairong;LIU Yongsheng;YANG Chaoshuai;PAN Yue(China Railway Tunnel Group Co.,Ltd.,Guangzhou 511458,Guangdong,China;Guangdong Provincial Key Laboratory of Intelligent Monitoring and Maintenance of Tunnel Structure,Guangzhou 511458,Guangdong,China;China Railway Tunnel Consultants Co.,Ltd.,Guangzhou 511458,Guangdong,China)
机构地区:[1]中铁隧道局集团有限公司,广东广州511458 [2]广东省隧道结构智能监控与维护企业重点实验室,广东广州511458 [3]中铁隧道勘察设计研究院有限公司,广东广州511458
出 处:《隧道建设(中英文)》2022年第6期943-952,共10页Tunnel Construction
基 金:中国中铁重大专项(2019-专项-03)。
摘 要:针对巨跨超扁平洞库围岩荷载分布的复杂性和施工的困难性,为填补国内远超50 m级巨跨超扁平洞库修造技术的空白,提升对支护结构和围岩受力特征的认知,依托巨跨洞库工程展开了巨跨超扁平地下洞库开挖过程中支护技术的研究。通过对巨跨洞库锚喷支护进行数值模拟,得到不同支护结构的受力情况,并对不同支护结构的支护效果进行对比分析。结果表明:1)在开挖过程中,系统锚杆轴力和喷射混凝土结构内力总体较小,相比之下锚索的拉力较大;2)在拆除两侧岩柱时,锚索拉力增幅较大;3)锚索轴力监测数据和数值模拟的变化趋势相同,验证了数值模拟计算结果的合理性。因此,可以认为在整个施工过程中,锚索对围岩稳定起主要支护作用。Because of the complex load distribution of surrounding rocks,giant-span flat caverns frequently face more construction challenges.The support technology of a giant-span flat underground cavern is studied to investigate the construction technology of a giant-span underground cavern(far more than 50 m-level) in China and improve cognition of supporting structure and surrounding rock stress characteristics.Through a numerical simulation analysis of anchorshotcrete support of giant-span cavern,stress characteristics of different support structures are obtained,and the supporting effect of different support structures is compared and analyzed.The results show the following:(1) The axial force of anchor cable and the internal force of shotcrete structure are relatively small during excavation process,but the tensile force of anchor cable is relatively large.(2) When removing the rock pillars on both sides,the tension of the anchor cable increases sharply.(3) The variation trend of anchor cable axial force monitoring data matches that of numerical simulation,thereby confirming the validity of the numerical simulation results.Therefore,the anchor cable can be considered to contribute to the stability of the surrounding rock throughout the construction process.
关 键 词:巨跨扁平地下洞库 锚喷支护措施 预应力锚索 支护受力特征
分 类 号:U453.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49