检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王永祥[1] 廖婷 李洪高 詹同江 耿大新[1] WANG Yongxiang;LIAO Ting;LI Honggao;ZHAN Tongjiang;GENG Daxin(School of Civil Engineering and Architecture,East China Jiaotong University,Nanchang Jiangxi 330013,China)
机构地区:[1]华东交通大学土木建筑学院,江西南昌330013
出 处:《中国安全生产科学技术》2022年第6期127-133,共7页Journal of Safety Science and Technology
基 金:国家自然科学基金项目(51768021);江西省2020年度研究生创新资金项目(YC2020-S320)。
摘 要:为提高地铁车站深基坑施工危险性测度的准确性,考虑多风险因素耦合作用和危险性测度主观性对传统风险评测结果的影响,提出基于结构方程(SEM)与蒙特卡洛模拟(MC)相结合的地铁车站深基坑施工危险性测度方法。首先,从基坑支护、基坑开挖、降水排水以及周边环境4个维度建立危险性测度指标体系,利用SEM确定指标权重,并确定关键因素;然后,根据指标的数据分布特征,利用MC法模拟出潜变量值并与风险损失程度、指标权重相结合得出危险度;最后,将该危险性测度方法运用于南昌地铁双港站。研究结果表明:该地铁车站深基坑风险等级为4级,基坑开挖为该地铁车站深基坑施工主要风险影响因素,其直接影响因素为开挖技术参数设置。项目实施结果表明该方法对地铁车站深基坑施工危险性评测适用可信。In order to enhance the accuracy of risk measurement on the deep foundation pit construction in metro station,considering the influence of the coupling effect of multiple risk factors and the subjectivity of risk measurement on the results of traditional risk measurement,a risk measurement method for the deep foundation pit construction in metro station based on the combination of structural equation modeling(SEM)and Monte Carlo simulation(MC)was proposed.Firstly,an index system of risk measurement was established from four dimensions of foundation pit support,foundation pit excavation,precipitation and drainage,and surrounding environment,then the weights of indexes were determined by using SEM,and the key factors were determined.Secondly,according to the data distribution characteristics of indexes,the values of latent variables were simulated by using MC method and combined with the risk loss degree and index weights to obtain the risk degree.Finally,the method of risk measurement was applied to the Shuanggang Station of Nanchang Metro.The results showed that the risk grade of deep foundation pit in this station was Grade IV,the foundation pit excavation was the main risk influencing factor of deep foundation pit construction in this metro station,and the direct influencing factor was the setting of excavation technical parameters.The implementation results of project indicated that this method is applicable and reliable for the risk measurement on the deep foundation pit construction in metro stations.
关 键 词:深基坑 结构方程(SEM) 蒙特卡洛模拟(MC) 危险性
分 类 号:X947[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222