检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈一亮 CHEN Yiliang(China Nerin Engineering Co.,Ltd.,Nanchang,Jiangxi 330038,China)
机构地区:[1]中国瑞林工程技术股份有限公司,江西南昌330038
出 处:《有色冶金设计与研究》2022年第3期47-51,共5页Nonferrous Metals Engineering & Research
摘 要:以九龙湖公园真趣园为例,通过对建设过程中遇到的问题及解决方案的分析,探究了在儿童公园建设各阶段的管理要点,包括决策阶段的选址决策、规划设计阶段对儿童主题表达的设计、施工及运营阶段对建设过程中存在的问题进行预判和提前准备,为后期建设儿童主题公园提供经验和建议。Taking the true fun park of Jiulong Lake Park as an example,through the analysis of the problems encountered in the construction process and the solutions,this paper explores the key management points in each stage of the construction of children's theme park,including the site selection decision in the decision-making stage,the design,construction and operation of children's theme expression in the planning and design stage,and the pre judgment and preparation of the problems existing in the construction process,so as to provide experience and suggestions for the later construction of children's theme park.
分 类 号:TU986.56[建筑科学—城市规划与设计]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171