检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚树阳 Yao Shuyang(Zhaolou Coal Mine,Yanzhou Coal Heze Energy and Chemical Co.,Ltd.,Shandong Heze 274705)
机构地区:[1]兖煤菏泽能化有限公司赵楼煤矿,山东菏泽274705
出 处:《山东煤炭科技》2022年第6期122-124,共3页Shandong Coal Science and Technology
摘 要:赵楼煤矿5309轨顺掘进工作面,巷道沿空掘进,针对顶帮部淋涌水造成巷道温度较高、作业环境差、职工工作效率低下、严重影响掘进进尺效率的问题,通过采取排水硐室集中排水降温、更换大功率局部通风机降温、制冷管路延接多台空冷器循环设置降温等方式方法,研究提出了新式制冷方案并进行了应用,改善了现场作业环境,职工工作效率提高,进尺速度提升。In the 5309 rail heading face of Zhaolou Coal Mine,the roadway is driven along the goaf,aiming at the problems of high roadway temperature,poor working environment and low working efficiency caused by water gushing from the top part,which seriously affects the efficiency of tunneling footage,by adopting the cooling methods such as centralized drainage in drainage chamber,replacement of high-power local ventilator,extension of refrigeration pipeline and cycle setting of multiple air coolers and so on,a new refrigeration scheme is put forward and applied,which improves the on-site working environment,the working efficiency of the workers and the footage speed.
关 键 词:千米深井 掘进巷道 高温热害 排水降温 机械制冷
分 类 号:TD727.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249