检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王彪 姚旭初[1] 袁鸿鹄[1] 孙洪升[1] 汪琪[1] 张如满[1] WANG Biao;YAO Xuchu;YUAN Honghu;SUN Hongsheng;WANG Qi;ZHANG Ruman(Beijing Institute of Water,Beijing 100048,China)
出 处:《北京水务》2022年第3期38-42,共5页Beijing Water
摘 要:采用定性分析和定量计算相结合的方式,分析了冬奥会综合管廊工程施工期和运行期对地下水环境的影响。结果表明:综合管廊施工期涌水量和运行期排水量均低于山岭隧道地下水排放限值,对地下水资源量的影响较小,对流场的影响范围有限,对水质几乎无影响。通过该项研究,可为冬奥会综合管廊工程的规划设计和施工提供参考和支撑。By combining qualitative analysis and quantitative calculation,this paper analyzes the impact of the construction period and operation period of the utility tunnel project of the Winter Olympic Games on the groundwater environment.The results show that the water inflow and the drainage during the construction and operation period of the utility tunnel are lower than the groundwater discharge limit of the mountain tunnel,which has little impact on the groundwater resources,limited impact on the flow field and almost no impact on the water quality.This study can provide reference and support for the planning,design and construction of the comprehensive pipe gallery project of the Winter Olympic Games.
分 类 号:P641.69[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.134.105.118