作 者:张永科 ZHANG Yong-ke(Hunan Lianshao Construction Engineering(Group)Co.Ltd.,Changsha 410000,China)
机构地区:[1]湖南涟邵建设工程(集团)有限责任公司,长沙410000
出 处:《工程建设与设计》2022年第11期221-224,共4页Construction & Design for Engineering
摘 要:普朗铜矿位于高原地区,其井下溜破系统施工中存在掘进难度大、施工效率低、作业人员劳动强度大等问题。论文阐述该工程中溜破系统应用体化快速施工技术,解决了高海拔工程施工的特殊要求,加快了施工进度,确保了施工安全。普朗铜矿基建过程中应用溜破系统立体化施工,并在实际应用中不断摸索优化,逐步形成了一套较为成熟的应对高原地区特殊的施工方法,取得了良好的社会效益。Pulang copper mine is located in the plateau area, and there are some problems in the construction of difficult tunneling, low construction efficiency and high labor intensity of operators. The paper expounds that the sliding break system applies the three-dimensional and rapid construction technology, solves the special requirements of high altitude engineering construction, accelerates the construction progress,and ensures the construction safety. In the process of Pulang copper mine construction, the three-dimensional construction of sliding system is applied, and in the practical application the construction constantly is explored and optimized, gradually a relatively mature construction method is formed to deal with the special construction in the plateau area, and has achieved good social benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7