检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄涛 Huang Tao(Beijing Institute of Architectural Design,Beijing)
机构地区:[1]北京市建筑设计研究院有限公司,北京100045
出 处:《暖通空调》2022年第7期85-89,共5页Heating Ventilating & Air Conditioning
摘 要:该工程在原有系统基础上增设加班时段空调,满足该空调系统独立运行的前提下尽量保持原有设备和系统的完整性,不影响整个园区空调系统。提出了3种设计方案,遵循尽量利旧、控制成本、节能环保的原则,选择模块化空气源热泵机组方案。介绍了该空调系统的空调负荷、机组安装位置及运行模式。阐述了空气源热泵机组的选择,并计算了其静态回收期。该方案可满足加班时段空调使用需求,静态回收期仅2.39 a。The project adds the air conditioning system for the overtime period on the basis of the original system to maintain the integrity of the original equipment and system as far as possible under the premise of independent operation of the air conditioning system,and does not affect the air conditioning system of the whole park.Three kinds of design schemes are proposed,and the modular air-source heat pump unit is selected in accordance with the principles of using the old as much as possible,cost control,energy saving and environmental protection.The air conditioning load,installation location and operation mode of the air conditioning system are presented.The selection of the air-source heat pump unit is elaborated,and its static recovery period is calculated.The scheme can meet the demand for air conditioning during overtime,and the static payback period is only 2.39 years.
关 键 词:既有建筑 办公楼 空调系统改造 加班时段 空气源热泵 方案选择
分 类 号:TU831.3[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7