检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王亚飞 WANG Yafei(Pang Pang Ta Coal Mine,Lvliang 033200,China)
机构地区:[1]霍州煤电集团吕临能化有限公司庞庞塔煤矿,山西吕梁033200
出 处:《煤矿现代化》2022年第4期97-101,共5页Coal Mine Modernization
摘 要:以庞庞塔矿10号煤层综放沿空掘巷为工程背景,采用理论分析、数值模拟的方法,建立了沿空掘巷覆岩破断模型,理论计算了综放沿空掘巷煤柱合理宽度,分析了不同阶段煤柱宽度对煤柱应力演化的影响规律,同时,考虑到煤层煤质较软、小煤柱易片帮等特点,最终确定庞庞塔矿10号煤层综放沿空掘巷煤柱宽度为9 m。Based on the engineering background of the 10 coal seam of Pangpangta Mine,using theoretical analysis and numerical simulation,a broken model of cladding along the empty excavation lane is established,and the reasonable width of the coal column along the empty excavation lane is calculated theoretically,and different differences are analyzed The influence law of the width of the coal column on the stress evolution of the coal column in the stage,taking into account the characteristics of soft coal seam coal quality and small coal column transpose gang,finally determined that the width of the coal column along the empty excavation lane of the Pangpangta mine was determined to be 9m.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15