检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]School of Mathematics and Statistics,Zhengzhou University,Zhengzhou 450001,China [2]College of Information and Management Science,Henan Agricultural University,Zhengzhou 450003,China
出 处:《Journal of the Operations Research Society of China》2018年第3期349-389,共41页中国运筹学会会刊(英文)
基 金:This research was supported in part by the National Natural Science Foundation of China(Nos.11771406,11571321 and U1504103).
摘 要:This paper considers competitive project scheduling on two unbounded parallel batch machines.There are two competing firms,and each firm has an unbounded parallel batch machine.All projects must be performed in batches by Firms 1 and 2 on their machines,respectively.The profit that each firm obtains from each project depends on whether the firm finishes the job before or after its competitor.In the first problem,given a feasible schedule for Firm 1,the objective is to find an optimal schedule to maximize the total reward for Firm 2 under the given schedule for Firm 1.The corresponding total reward for Firm 1 is called the worst-case total reward of the given schedule for Firm 1.In the second problem,the objective is to find an optimal schedule for Firm 1 to maximize the worst-case total reward.We provide optimal algorithms for the two problems,respectively.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249