检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡丹[1] 胡顺渠[1] 陈晨[1] 侯治民 周怡君[1] HU Dan;HU Shunqu;CHEN Chen;HOU Zhimin;ZHOU Yijun(Petroleum Engineering Technology Institute of Southwest Petroleum Branch,SINOPEC,Deyang,Sichuan 618000,China)
机构地区:[1]中国石化西南油气分公司石油工程技术研究院,四川德阳618000
出 处:《西南石油大学学报(自然科学版)》2022年第3期224-234,共11页Journal of Southwest Petroleum University(Science & Technology Edition)
基 金:国家科技重大专项(2016ZX05021-005-006HZ)。
摘 要:致密砂岩气藏储层岩石致密,自然产能低,水平井无限级压裂是高效开发的必要手段。常用的投球滑套分段级数受限、管柱缩径,难以实施储层评价、井筒维护等措施作业,泵送桥塞工艺虽可实现无限级分段,但施工不连续、作业成本高;同时,上述压裂装置均存在功能单一,无法满足生产控水等需求。根据气藏开发对工具“不限级、全通径、可开关、工序联作”的功能需求,创新全通径不限级滑套设计方法、提出环状凸齿与凹槽唯一配对的无限级实现方式,设计出具有复合弹片-多功能球笼的开启组件以及带选位槽和内藏胶筒的滑套本体,形成了全通径无限级可开关的滑套结构。工具系统已在川西中浅层致密砂岩气藏近200口推广应用,与国内外同类技术相比,作业效率可提高50%;成功在DS103-2等井实施选择性开关作业,为致密砂岩气藏高效开发提供了全新的工具系统。Tight sandstone gas reservoirs is characterized by tightly rocks and low natural productivity.Infinite staged fracturing technology for horizontal wells is the necessary means of high efficient development for this gas reservoirs.It is difficult to implement measures such as reservoir evaluation and wellbore maintenance due to the limited segmented stages of ball throwing sliding sleeve and pipe string shrinkage,although the plug and perfortion can achieve infinite stages,but the construction is not continuous,operating costs are high.Meanwhile,those fracturing tools have single function,which cannot meet the needs of water control of production wells.According to the function requirement of“non-limited,full-bore,switchable,combined operation”gas reservoir,the theory of full-bore non-limited design is innovated,the open assembly with compound shrapnelmulti-function ball cage structure and the sliding sleeve body with position selection slot and inner rubber cylinder are designed,and the full-diameter sliding sleeve structure with infinite stage is formed.The tool system has been used to nearly 200 wells in tight sandstone gas reservoirs in Western Sichuan Basin.Compared with the same technology at home and abroad,the operating efficiency can be improved by 50%,the selective switch operation is successfully carried out in production wells such as Well DS103–2.It provides a new tool system for efficient development of tight sandstone gas reservoirs.
分 类 号:TE348[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.48.163