检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Jin-Jiang Yuan
机构地区:[1]School of Mathematics and Statistics,Zhengzhou University,Zhengzhou 450001,China
出 处:《Journal of the Operations Research Society of China》2016年第3期379-384,共6页中国运筹学会会刊(英文)
基 金:the National Natural Science Foundation of China(Nos.11271338 and 71301038);the National Natural Science Foundation of Henan Province(No.15IRTSTHN006).
摘 要:We study the computational complexities of three problems on multi-agent scheduling on a single machine.Among the three problems,the computational complexities of the first two problems were still open and the last problem was shown to be unary NP-hard in the literature.We show in this paper that the first two problems are unary NP-hard.We also show that the unary NP-hardness proof for the last problem in the literature is invalid,and so,the exact complexity of the problem is still open.
关 键 词:Multi-agent scheduling Competing agents Non-disjoint agents Unary NP-hard
分 类 号:TP3[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147