某铀矿山主竖井井筒装备设计  

Design of Main Shaft Equipment in a Uranium Mine

在线阅读下载全文

作  者:施林峰 吕继民 韩建辉 SHI Linfeng;LV Jimin;HAN Jianhui(The Fourth Research and Design Engineering Corporation,CNNC,Shijiazhuang 050021,China)

机构地区:[1]中核第四研究设计工程有限公司,河北石家庄050021

出  处:《铀矿冶》2022年第3期224-231,共8页Uranium Mining and Metallurgy

摘  要:以某铀矿山主竖井为例,通过对断面布置要求、罐道形式选择、梯子间、风水管路布设、主要受力梁验算等设计要素分析,系统介绍了铀矿山主竖井井筒装备的设计方法、设计过程。在分析竖井井筒断面布置主要影响因素的基础上,进一步优化了井筒断面布置。Taking the main shaft of a uranium mine as an example,the design method and process of main shaft equipment in uranium mine were systematically introduced through the analysis of design elements such as section layout requirements,cage guide form selection,ladders,air and water pipeline layout,main stress beam checking calculation and so on.On the basis of analyzing the main influencing factors of shaft section layout,the shaft section layout was further optimized.

关 键 词:铀矿山 主竖井 井筒装备 断面布置 

分 类 号:TD211[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象